Home / Resources / Sign Permit Guide
Permits and Approvals

Sign Permit Guide: How Business Sign Approvals Work in New Jersey and NYC

Most outdoor business signs need approval before they go up. This guide explains what New Jersey towns usually ask for, how New York City sign permits differ, and what you can prepare to keep your sign on schedule. Written from the permit packages we prepare for customers across New Jersey. Working in the city? See our NYC service area.

NJ Towns
Zoning and construction
NYC
Department of Buildings
Lit Signs
Electrical approval
We Help
Drawings and paperwork
Crew installing a storefront sign from a lift
Approved, then installed
Our crew hangs a storefront sign once the town signs off.
Which Signs Need a Permit

Does My Business Sign Need a Permit?

A quick sort. Your town or city has the final word, so always check your address.

Usually needs approval
Most outdoor signs
  • Wall signs, channel letters and light boxes
  • Blade and projecting signs over the sidewalk
  • Awnings with lettering, in many towns
  • Any sign with lighting or power
Sometimes needs approval
Depends on the town
  • Window graphics over a set share of the glass
  • Sidewalk A frames on public sidewalks
  • Temporary banners and grand opening signs
  • Construction site and real estate signs
Usually no town permit
Inside your space
  • Lobby signs and dimensional letters
  • Office, room and ADA signs
  • Wayfinding and directories inside
  • Your building may still have its own rules
New Jersey vs New York City

How Sign Permits Differ in New Jersey and New York City

The basic idea is the same: the sign is reviewed before it goes up. Who reviews it and what they ask for is different.

New JerseyNew York City
Who reviews itYour town zoning office, and often the construction officeNYC Department of Buildings (DOB)
What is checkedSign size, placement, lighting and the town sign ordinanceSize, projection, lighting, structure and zoning
When a permit is neededMost outdoor business signs; rules vary town by townSigns over 6 square feet and any illuminated sign
Who can installA sign company, with a licensed electrician for lit signsLarger signs need a licensed sign hanger
Historic areasSome towns have historic district reviewsLandmark buildings and districts also need LPC review
Landlord rulesShopping centers often have their own sign criteriaBuilding owners often require approval too

Sources: NYC DOB sign permit requirements and the NYC LPC signage guidebook. New Jersey rules are set by each municipality.

Step by Step

How a Sign Permit Usually Moves From Idea to Approval

Most of the work is in the drawings. The cleaner the package, the faster the review.

installers holding full size pattern office wall
01

Survey and measure

We measure the storefront and note the wall, power and clearances.

Layout drawing with measurements for a painted wall sign
02

Drawings and specs

Scaled drawings show the sign size, placement, materials and lighting.

Residential project board with an elevation drawing of a narrow building on the right
03

Submit and answer

The package goes to the town or city, along with any landlord approval.

Shop worker wiring LED modules into channel letters
04

Build and install

Once approved, we build the sign and our crew installs it.

Be Ready

What to Gather Before You Apply for a Sign Permit

Most delays come from missing paperwork, not the sign itself.

  • The property address and block and lot, if you have it.
  • Photos of the building front and the spot for the sign.
  • Storefront width, and the sign band size if there is one.
  • Landlord or shopping center sign criteria and written approval.
  • Your business name exactly as it will appear on the sign.
  • Any existing signs that will stay or come down.

Not sure where to start? Our sign permit service prepares the drawings and walks the paperwork through with you.

Commercial project board with a large red and black construction company logo
Project board with a builder logo
FAQs

Sign Permit FAQs

Straight answers to what business owners ask about sign approvals.

Do I need a permit for a business sign in New Jersey?

Usually, yes, for outdoor signs. Most New Jersey towns require zoning approval for business signs, and many also need a construction permit. Lit signs need an electrical connection by a licensed electrician.

It depends on the town or city and how complete the package is. Some towns review quickly; others meet on a schedule. Plan the permit into your opening date and ask us early.

Usually not from the town, as long as it is inside your space. Your landlord or building may still have rules.

The NYC Department of Buildings requires a permit for signs over 6 square feet and for any illuminated sign. Larger installs need a licensed sign hanger.

In New York City, signs on landmark buildings or in historic districts also need Landmarks Preservation Commission review. Some New Jersey towns have historic district rules too.

Often, yes. Shopping centers and many buildings have sign criteria covering size, color, lighting and mounting. Get them before the sign is designed.

Ask a Specialist

Have a Technical Question?

Reach out to our product specialist. We will make sure you get the right help and guide you with our best knowledge, whether it is sizes, materials, colors, lighting or permits.

Prefer to talk? Call 908-486-7000.